Auer Theatre

Project Detail

Planning, delivery and installation of a complete fixed stage system with electric theatre winches, carpentry structures, guided acoustic panels, stage floor, stage trolleys for storage and stage extension, curtains and control system.

Customer

Gemeinde Ora

Architect

Arch. Perktold

Year of Construction

2012

Scope of delivery

  • Compact theatre winches
  • Control of stage mechanics
  • Acoustic reflectors and panelling
  • Stage substructure with stage wagon and stage extension
  • Stage floor
  • Multimedia, lighting, audio and video
  • Load-bearing steel structure for stage technology
  • Theatre fabrics and motorised movement system
  • Annual maintenance
Share this project:

More projects

Haydn Concert Hall Bolzano
Algund Theatre